"id": 280766,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/280766/?format=api",
"text_counter": 32,
"type": "speech",
"speaker_name": "Mr. Obure",
"speaker_title": "The Minister for Public Works",
"speaker": {
"id": 118,
"legal_name": "Christopher Mogere Obure",
"slug": "christopher-obure"
},
"content": " Thank you very much, Mr. Speaker, Sir. I beg to reply. (a) Construction of the foot bridge at Village Six in Bura commenced on 30th April, 2010. That project is supposed to have been completed on 30th July, the same year. This was actually a three months contract. Although the bridge is largely complete, I am aware that the approach ramp has been eroded on one side. However, I want to assure the Member for Bura that arrangements have been made for repairs to be carried out in the shortest possible time. (b) A copy of the contract document is available and I will be able to table it right now. (c) With regard to how much money was allocated for this particular project, I would like to confirm that the original contract sum was Kshs5,719,590.50. The amount utilized already is Kshs5,589,446 leaving a balance of Kshs130,144. I also want to confirm that additional funds have been allocated for this project to the tune of Kshs1.3 million to be able to complete work as a result of the re-designing which we had to do."
}