GET /api/v0.1/hansard/entries/28384/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 28384,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/28384/?format=api",
"text_counter": 98,
"type": "speech",
"speaker_name": "Mr. Kingi",
"speaker_title": "The Minister for Fisheries Development",
"speaker": {
"id": 27,
"legal_name": "Amason Jeffah Kingi",
"slug": "amason-kingi"
},
"content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) I am aware of the EU funded project and not the World Bank project. (i) Delays in procurement and delivery of the cold storage equipment and non- clearance of duty has caused the temporary stalling of the projects. However, the Ministry applied for exemption of taxes on the equipment. (ii) The clearance letter was received from the Ministry of Finance and the installation of the ice making machines at Nyandiwa and Sori have been completed. (b) The EU funded project allowed for only 10 per cent variations per site. The original designs of the jetty were defective and require variations to reduce the heights and include a ramp to allow for a small fishing craft to access the facility. Variations of the six sites were done in December, 2012 and approved by the donor. (c) The project was designed such that the contractor is only paid for the work he has undertaken. The contractor moved to the Ogal Beach and completed the installation of the cold room and is expected to complete Mukuloba by 2nd September, 2011. He will, thereafter, move to Wich Lum and Luanda Kotieno."
}