GET /api/v0.1/hansard/entries/285579/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 285579,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/285579/?format=api",
    "text_counter": 299,
    "type": "speech",
    "speaker_name": "Mr. Magerer",
    "speaker_title": "The Assistant Minister for Energy",
    "speaker": {
        "id": 51,
        "legal_name": "Magerer Kiprono Langat",
        "slug": "magerer-langat"
    },
    "content": " Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) I am aware that electricity projects at Ikatini Market, Ikatini Secondary School, Kathiini Market, Kathiini borehole, Kathiini dispensary, Itunduimuni Market, Itunduimuni dispensary, Mathauta Secondary School, Kwawanzilu Market, Kwanwanzilu borehole and Kwawanzilu Secondary School were commissioned in 2008. (b) I am also aware that all these institutions were supplied with singe phase transformers. (c) Kenya Power Company (KPC) will replace single phase transformers with three-phase ones when consumption of power in each area demonstrates the need for three-phase electricity connectivity. I would also like to add that single phase transformers are installed on the basis of demand assessment undertaken both by KPC and Rural Electrification Authority (REA). However, as demand rises such transformers are replaced with three-phase ones."
}