GET /api/v0.1/hansard/entries/331415/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 331415,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/331415/?format=api",
    "text_counter": 133,
    "type": "other",
    "speaker_name": "",
    "speaker_title": "",
    "speaker": null,
    "content": "14. Junction URP 6 Boka 15. Junction A3 Bangale-Kaniki. ` (b) Mr. Speaker, Sir, I wish to clarify that the procedure for evaluation of road works tenders does not involve award of scores. The evaluation procedure is divided into three stages. (i) Preliminary Evaluation (ii) Detailed Evaluation (ii) Financial Evaluation. And as such, I wish to table the list providing names and addresses of the companies which bid for each of the roads in Appendix A, and the list of evaluated contractor’s tender sum for each tendered road as compared to the engineer’s estimates in Appendix B. It should be noted that the above mentioned processes are undertaken by the Constituency Roads Committee where the hon. Member of Parliament is also a member. (b) Out of the 15 roads tendered for, 14 of them have been completed and only one is still ongoing. The ongoing remaining works are the installation of culverts on Junction B8 Bura Bangale (URA 3) road and it is expected to be completed by the end of November 2012. So, I table the documents."
}