GET /api/v0.1/hansard/entries/333603/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 333603,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/333603/?format=api",
    "text_counter": 111,
    "type": "speech",
    "speaker_name": "Eng. Rege",
    "speaker_title": "",
    "speaker": {
        "id": 135,
        "legal_name": "James Kwanya Rege",
        "slug": "james-rege"
    },
    "content": "Mr. Deputy Speaker, Sir, could the Minister tell us why the contractors who are rolling out lines are not given firm instructions to ensure that all the disconnected lines are put back after they are through with the new installation work? I am asking this because most power outages that we have are a nuisance. When the KPC taps off lines for contractors to put up new lines, they forget to put back the switches. I think that will help. In rural areas, most of the people use electricity in the evenings. So, this is very important even with lack of, or inadequate, electricity in the region."
}