GET /api/v0.1/hansard/entries/34511/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 34511,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/34511/?format=api",
    "text_counter": 301,
    "type": "speech",
    "speaker_name": "Mr. Kinyanjui",
    "speaker_title": "",
    "speaker": {
        "id": 48,
        "legal_name": "Lee Maiyani Kinyanjui",
        "slug": "lee-kinyanjui"
    },
    "content": "Mr. Deputy Speaker, Sir, I wish to confirm that we have been able to forward the deposit to the contractor. Therefore, there is no reason why he should not be able to start the work as planned. I also wish to confirm that the contract sum for the project is Kshs1,488,339,000. The sections to be covered under this contract include the remaining section of D251, that is, approximately 13.9 kilometres long, and two, from Manyasi Junction to Bunyala District Headquarters in Rwamba; that is, Road E1201, and is approximately six kilometres long. Then we have Road C30, the junction to R21 and D251, that is, approximately one kilometre long. Also, we have Rwamba Junction, that is, D251 to C30 and then the tarmacked section between the two tarmacked sections on C30. Lastly, we have Port Victoria to Bukoma Beach, that is, approximately two kilometres long."
}