GET /api/v0.1/hansard/entries/381974/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 381974,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/381974/?format=api",
    "text_counter": 156,
    "type": "other",
    "speaker_name": "",
    "speaker_title": "",
    "speaker": null,
    "content": "I expected a lot of transfer of knowledge to be done by the Government when this dam was built. Again, Mr. Temporary Speaker, Sir, downstream between Pokot and Turkana counties, there was supposed to be a massive irrigation project as a result of the water flowing down. However, this is not for the people who have been displaced, rather it is for the people living downstreams in the flatland between Pokot and Turkana. But no single inch of land has ever been irrigated. So, Mr. Temporary Speaker, Sir, I have come to say that 22 years ago, this dam came as a blessing in disguise for other people. We have not really benefitted from the connectivity that we were talking about here. Sen. Murungi said that most of the schools have received electricity power. How can you go round Turkwel Dam without a road to The electronic version of the Senate Hansard Report is for information purposes only. A certified version of this Report can be obtained from the Hansard Editor, Senate."
}