GET /api/v0.1/hansard/entries/403402/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 403402,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/403402/?format=api",
"text_counter": 189,
"type": "speech",
"speaker_name": "Hon. A.B. Duale",
"speaker_title": "",
"speaker": {
"id": 15,
"legal_name": "Aden Bare Duale",
"slug": "aden-duale"
},
"content": "However, we are in the process of establishing the number of transformers per county and constituency which would have been more relevant, bearing in mind the determination of the level of electricity per county. In the meantime, we have indicated the total length of power transmission/distribution lines in the country. For the voltage level of 400KV, we do not have anything. We have no length. For 220KV, we have 1,331 kilometres; for 132KV, we have 2,436 kilometres; for 66KV we have 1,097 kilometres; for 33KV, we have 1,632 kilometres; and for 11KV, we have 28,881kilometres. The total domestic and industrial electricity connections per county in the county is given below, starting with Mombasa County which has 157,182; Nairobi County has 762,978, but the total is 2,499,115."
}