GET /api/v0.1/hansard/entries/452023/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 452023,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/452023/?format=api",
"text_counter": 25,
"type": "other",
"speaker_name": "",
"speaker_title": "",
"speaker": null,
"content": "(iii) the steps being taken by the Ministry to provide a turn off and an acceleration lane to the Ridgeways Mall to reduce traffic jam. I beg to reply. The digging up of the trenches on this road is as a result of scrap metal vendors who dig the road to remove the underground mounted cables that connect various street lighting poles. The destruction is carried out late at night under the cover of darkness and Karura Forest making it difficult to guarantee safety of pedestrians and road users during the ongoing road activities. The matter has already been reported to the police with a view of apprehending these criminals. There is traffic jam as a result of the construction of Ridgeway Mall which was done after the rehabilitation of Kiambu Road in 2007. The construction of Ridgeway Mall did not include acceleration and deceleration lines for vehicles leaving and entering the Mall, hence creating traffic jam. However there is a proposal to redesign the section of the road to include acceleration, deceleration and parking lane."
}