GET /api/v0.1/hansard/entries/51627/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 51627,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/51627/?format=api",
"text_counter": 19,
"type": "speech",
"speaker_name": "Mr. Obure",
"speaker_title": "The Minister for Public Works",
"speaker": {
"id": 118,
"legal_name": "Christopher Mogere Obure",
"slug": "christopher-obure"
},
"content": " Mr. Speaker, Sir, on behalf of the Minister for Roads, I beg to to reply. NyongoroâKiunga Section is made up of three roads, namely; the section from Nyongoro to Hindi, comprising of a 70 kilometers road, HindiâBudhei which is about 43 kilometers and the last section is Budhei Junction to Kiunga, which is approximately 126 kilometers. Mr. Speaker, Sir, I am not able to tell exactly when the Government will tarmack this road. However, the Ministry of Roads has completed the design to bitumen standard of the section between Nyongoro and Hindi, and will now source for funds for construction. For the section between Hindi and Kiunga, the Ministry of Roads, through the relevant roads authority, has proposed to carry out a design for construction to bitumen standard of that section of the road. Once the design is completed the Ministry will embark on sourcing for funds for tamacking of the road. In the mean time, I wish to assure the hon. Member that funds have been allocated and will continue to be allocated for maintenance of that road to ensure that it is motorable at all times."
}