GET /api/v0.1/hansard/entries/54201/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 54201,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/54201/?format=api",
    "text_counter": 88,
    "type": "speech",
    "speaker_name": "Mr. Kinyanjui",
    "speaker_title": "",
    "speaker": {
        "id": 48,
        "legal_name": "Lee Maiyani Kinyanjui",
        "slug": "lee-kinyanjui"
    },
    "content": "Mr. Speaker, Sir, as I indicated, my Ministry, through KENHA, has set aside a total of Kshs185.5 million for B9 and a total of Kshs38.4 million for C116. The money set aside for B9 will cover the entire B9, which is the Isiolo-Modogashe section. The road is actually located in Isiolo and Garissa counties. The project starts in Isiolo with the junction at A2 and passes through Garbatulla and ends in Modogashe. It will also incorporate the Modogashe-Wajir-Elwak Road. That is still part of B9 and this section is located in the Isiolo, Wajir and Mandera counties. Still on B9, we have the section called Elwak-Mandera and the project is located within Mandera County and it is approximately 215 kilometres."
}