GET /api/v0.1/hansard/entries/54245/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 54245,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/54245/?format=api",
    "text_counter": 132,
    "type": "speech",
    "speaker_name": "Mrs. Ngilu",
    "speaker_title": "The Minister for Water and Irrigation",
    "speaker": {
        "id": 111,
        "legal_name": "Charity Kaluki Ngilu",
        "slug": "charity-ngilu"
    },
    "content": "(c) The terms of the contract for Tula borehole was to drill a borehole to a depth of 200 metres, sample collection water quality analysis, casing, gravel parking, development and aquiva test pumping. Immediately after the contract was awarded, the contractor had one month to mobilize equipment to site. During the month of August 2010, the contractor went to site Tula and managed to drill up to a depth of 118 metres. The borehole drilling could not go beyond that depth due to mud formation which requires specialized equipment and which is not available in the region. That, therefore, forced the contractor to re-mobilize and source for a mud drilling rig to complete the drilling exercise. This has taken a bit of time, but I have just told the hon. Member that I have once again asked our technical people to ensure that this is done with speed, especially due to the drought."
}