GET /api/v0.1/hansard/entries/55229/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 55229,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/55229/?format=api",
"text_counter": 106,
"type": "speech",
"speaker_name": "Mrs. Ngilu",
"speaker_title": "The Minister for Water and Irrigation",
"speaker": {
"id": 111,
"legal_name": "Charity Kaluki Ngilu",
"slug": "charity-ngilu"
},
"content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) The implementation of Emali Water Township Water Project slowed down due to delayed release of funds. I can assure the hon. Member that the project will be completed before the end of this month. That is because people are already on the ground. (b) The name of the main contractor is General Industries. The project is intended to connect water from Nol Turesh Reserve Tank near Sultan Hamud with Emali Town, a distance of eight kilometers. The scope of works comprise of bush clearing of pipeline route, excavation of trench, provision and laying of six-inch diameter pipe intake for the eight kilometers, testing of the pipeline, construction of the four water kiosks and laying of four kilometers distribution of three-inch UPVC pipes network. So far, no payments have been made, although the works are about to be completed."
}