GET /api/v0.1/hansard/entries/61527/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 61527,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/61527/?format=api",
    "text_counter": 110,
    "type": "speech",
    "speaker_name": "Mr. Magerer",
    "speaker_title": "",
    "speaker": {
        "id": 51,
        "legal_name": "Magerer Kiprono Langat",
        "slug": "magerer-langat"
    },
    "content": "Mr. Speaker, Sir, the Ministry has ensured that the consumers of power have been subsidized. You will realize that every consumer who is within the range of 600 metres from the transformer has been allowed to connect at a cost of Kshs35,000 or thereabout. Therefore, it does not really matter whether you are very far away from the transformer as long as you are within at least 600 metres range. So, I think the idea that the Ministry had was to come in because previously we have had what we called the Umeme Pamoja where we had to ensure that we had a certain number of individuals who were willing to be connected to power and that their cost could actually justify the access to a transformer. Since we have realized that people are not able to be connected at the same time, the Ministry has come up with this suggestion, that within the 600 metres or 1.2 kilometre in terms of diameter from the middle, where the transformer is, power can be connected at the same cost."
}