GET /api/v0.1/hansard/entries/626192/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 626192,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/626192/?format=api",
    "text_counter": 194,
    "type": "other",
    "speaker_name": "",
    "speaker_title": "",
    "speaker": null,
    "content": "May, 2015 Hospitals fully Homa Bay, Gucha, Kilifi and MTRH equipped By end of Nakuru, Homa Bay, Thika, Kakamega, Gucha, Malava, Kisumu East, March, 2016 Isiolo, Naivasha, Kangundo, Voi, Tharaka, Nyahururu, Engineer, Kisii, JOOTRH, Masalani, Lamu, Faza, El Wak, Chebiemit, Taveta, Griftu, Emuhaya, Webuye, KerugoyaKianyaga, Murang’a, Nyeri, Karatina, Siaya, Bondo, Migori, Kehancha, Ziwa, Burnt Forest, Kericho, Sigowet, Longisa, Ndanai, Narok, Transmara, Embu, Kiambu,Ishiara, Kitui, Mwingi, Makueni, Makindu,Lopiding, Kacheliba, Endebess, Ol’kalou, Kapenguria, Kulacha, Gabartulla, Nyambene, Chukka, Nyamira, Keroka, Msambweni, Nanyuki, Mbagathi, Kabarnet, Eldama Ravine, Iten, Baragoi, Likoni, Kajiado, Loitokitok, Bungoma, Rachuonyo, Nandi Hills, Malindi, Mama Lucy and Kenyatta National Hospital (KNH). By end of May Garissa, Hola, Garsen, Mandera, Wajir, Busia, Kocholia, Vihiga, 2016 Kapsabet, Turkana, Kitale, Marsabit, Meru, Kinangop, Coast PGH, Spinal Injury, Mathare and Maralal. The number of facilities which will benefit by the end of the project is 94 county and two national hospitals will be fully equipped with theatre equipment; 94 county and two national hospitals will be equipped with state of the art sterilization equipment;there will be five dialysis machines, 3 dialysis chairs, 2 dialysis beds and unrelated dialysis equipment will be provided for each of the 47 counties and two national referral hospitals. Also, 94 county and four national hospitals will be equipped with state of the art digital x-ray, ultra sound and other imaging equipment and 11 Level 5 hospitals countrywide to be equipped with ICU facilities. This is supposed to be complete by May, 2016. I think these are the statements sought by the hon. Senator."
}