"id": 6555,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/6555/?format=api",
"text_counter": 113,
"type": "speech",
"speaker_name": "Mr. Bett",
"speaker_title": "The Minister for Roads",
"speaker": {
"id": 157,
"legal_name": "Franklin Kipng'etich Bett",
"slug": "franklin-bett"
},
"content": " Mr. Speaker, Sir, I beg to reply. (a) The length of Garissa-Modiak-Nuno Road is 23 kilometres long. Eleven kilometres of this section of the road was previously constructed to bitumen standard. The project was substantially completed in April 2009 and is now due for maintenance. The remaining 12-kilometre section between Modika and Nuno has been awarded for construction to bitumen standard and the contractor is mobilizing to start works. (b) A total length of 11 kilometres of the road has been tarmacked at a cost of Kshs748,214,113.60. (c) I wish to table the report as requested by the hon. Member."
}