GET /api/v0.1/hansard/entries/65893/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 65893,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/65893/?format=api",
"text_counter": 55,
"type": "speech",
"speaker_name": "Mr. ole Metito",
"speaker_title": "",
"speaker": {
"id": 199,
"legal_name": "Judah Katoo Ole-Metito",
"slug": "judah-ole-metito"
},
"content": "Mr. Speaker, Sir, Meru Central is covered by two regional development authorities. There is a little part of it that is covered by Ewaso Nyiro Development Authority while the larger part is covered by Tana and Athi River Development Authority (TARDA). In Meru North where Igembe North Constituency is located, we have the following projects: One dam with a capacity of 150,000 cubic metres; one large pan of 80,000 cubic metres; and one medium-size pan of 30,000 cubic metres. We also plan to do rain water harvesting at six different points. With regard to the specific locations where the projects will be undertaken, we are waiting for the consultancy reports which will show the design and the survey. It is at that point that we will sit down and agree on the areas with the potential for us to implement the six projects."
}