GET /api/v0.1/hansard/entries/664397/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 664397,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/664397/?format=api",
    "text_counter": 25,
    "type": "speech",
    "speaker_name": "Sen. Mwakulegwa",
    "speaker_title": "",
    "speaker": {
        "id": 101,
        "legal_name": "Danson Mwazo Mwakulegwa",
        "slug": "danson-mwazo"
    },
    "content": "Thank you Mr. Speaker, Sir. The request was from Sen. Khaniri who wanted a Statement from the Government on the move to reduce electricity connectivity fee. In that Statement, he wanted to know the following:- (a) State the amount of money charged for connection of electricity by customers whose premises are within 500 metres and those that are more than 500 metres from the existing electricity transformer. The response is as follows:- The company will charge Kshs15,000 to all domestic customers who are located within a radius of 600 metres from an existing transformer and have loads of equal to or less than 8 Kilovolt-ampere (KVA) single phase - that is charged at Kshs15,000. All commercial and industrial customers whose load and free phase exceed 8KVA shall be charged full cost of connection. Those who are beyond 600 metres from the existing transformer will be charged the cost of transformer and the network expansion or they will wait for the expansion of the network to their area. This cost will vary depending on The electronic version of the Senate Hansard Report is for information purposes only. A certified version of this Report can be obtained from the Hansard Editor, Senate"
}