GET /api/v0.1/hansard/entries/667458/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 667458,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/667458/?format=api",
"text_counter": 158,
"type": "speech",
"speaker_name": "Hon. Mbui",
"speaker_title": "",
"speaker": {
"id": 1750,
"legal_name": "Robert Mbui",
"slug": "robert-mbui"
},
"content": "taken from every angle. It is from Kithimani to Makutano Ma Mwala, Machakos County. Incidentally, it broke two records. The first one is that it had the most number of contractors on a single road. There were 11 contractors doing 33 kilometres. I think each was doing three kilometres. The second record it broke is that it was the fastest road to be done. It was done in three months. But there are three other records that nobody is talking about. The first record which is not stated is that it is the poorest designed road in Kenya. It is a road with a single line on the bridge and there are three to five bridges on that road. I wonder what they were thinking as they came up with that road. The second unknown record is that it is the most highly repaired road. Before it was commissioned, it was already being repaired. Those are things we have to talk about."
}