GET /api/v0.1/hansard/entries/704502/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 704502,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/704502/?format=api",
"text_counter": 88,
"type": "other",
"speaker_name": "",
"speaker_title": "",
"speaker": null,
"content": "Water Project (LHWP) The LHWP abstracts water from the rivers in the highlands of Lesotho and transfers it to the water deficient Vaal region in South Africa for industrial and residential use. This project transfers 233, 200 cubic metres annually. (c) Orange-Fish River Tunnel in South Africa. The waters of the Orange River are fed into the headwaters of the Great Brak River which flows into the Grass ridge dam 40 Kilometres north of Cradock to the Great Fish River through the Cookhouse Tunnel and finally to the Vogel River. The Orange-Fish Tunnel is 82.45 Kilomteres long and runs due south from the intake tower of Oviston to the Gariep Dam and to the outlet near the foot of the Teebus Kop. The tunnel is concrete lined with a diameter of 5.33 metres. (d) Inter-basin water transfers in Kenya. Kenya has inter-basin water transfer schemes which are either in operational or in planning phases. These are:-"
}