"content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) The tender for the construction of Katumba Borehole in Bangale Location was advertised in t he Daily Nation and The Standard on 12th March, 2010. Bids were submitted and evaluated, but after having a non-responsive bidder, the tender was re- advertised on 25th June, 2010. Bids were re-submitted and evaluated, and the responsive bidder awarded the tender. (b) The tender was awarded to the responsive bidder, M/s Atesian K. Limited of P.O. Box 126190 â 400, Nairobi on 5th October, 2010. (c) The scope of works in the contract is to carry out hydrological surveys and drill boreholes to a maximum depth of 280 metres. This implies that the driller can only be paid after drilling and getting water. The total sum of the contract, which includes other four boreholes in Kaloleni, Kilifi, Malindi, Tana Delta and Tana River, is Kshs10,775,730. The contractor is on the ground, and has completed the hydro-geological surveys. The works are to be completed in two-and-half months. The completion date is, therefore, expected to be 18th December, 2010. Thank you, Mr. Deputy Speaker, Sir."
}