GET /api/v0.1/hansard/entries/802032/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 802032,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/802032/?format=api",
    "text_counter": 89,
    "type": "speech",
    "speaker_name": "Hon. Ichung’wah",
    "speaker_title": "",
    "speaker": {
        "id": 1835,
        "legal_name": "Anthony Kimani Ichung'Wah",
        "slug": "anthony-kimani-ichungwah"
    },
    "content": "(1) That, to address the water needs, the following allocations be made: In Kajiado County; Kajiado East and South to receive Kshs.15 million and 20 million respectively for water pans for holding flood waters to be used for irrigation of pasture and drinking water for animals. Marsabit County drilling of boreholes to earth dams for water to be used for irrigation, drinking water for animals and other domestic use; Kshs.20 million per constituency amounting to a total of Kshs.80 million. In West Pokot County a feasibility design and compensation of land to facilitate construction of the Kaprom Dam at Kshs.100 million. (2) That, improvement of roads and other infrastructure is an urgent and critical need around the country. Cognisant of the fact that long-term tarmacking will take time, the Committee has set aside funds for the following counties for the development of all-weather roads and other infrastructure to be distributed in the following manner: In Nairobi County, Riruta-Dagoretti-Kawangware Road C63 - Kshs60 million. In Nakuru County, construction of Kuresoi North Sub-county Deputy County Commissioner’s (DCC’s) office and access roads will receive Kshs30 million and rehabilitation of roads in Nakuru East at Kshs10 million. Rehabilitation of roads in Bahati, Naivasha and Gilgil constituencies - Kshs10 million each. Bungoma County be given Kshs100 million for repairs of the following roads: Turbo-Naitiri-Sikhendu Road C44, the road covers three constituencies that is Turbo, Tongaren and Kiminini and the construction of Emia Road in Kopsiro area to help in movement of agricultural goods. In Nyamira County, rehabilitation of various roads (upgrading 100 kilometres) in Borabu, Kitutu Masaba, North Mugirango and West Mugirango constituencies, Kshs10 million to each. In Migori County, rehabilitation of various roads and construction of box culverts. Suna East Constituency - Kshs20 million, Suna West Constituency - Kshs15 million, Uriri Constituency - Kshs10 million, Nyatike Constituency - Kshs15 million, Kuria West Constituency - Kshs10 million, Kuria East Constituency - Kshs15 million, Awendo Constituency - Kshs15 million and Rongo Constituency - Kshs10 million. In Mombasa County, Aldina-Mikanjuni Road connects two wards in Jomvu that is Mikindani Ward and Jomvu Kuu Ward (3 km road stretch) receiving Kshs.15 million. Tharaka Nithi County, rehabilitation of various roads in Maara and Tharaka Constituencies will receive Kshs.10 million each. In Kirinyaga County, rehabilitation of various roads in Mwea and Gichugu Constituencies will get Kshs.15 million each and Kirinyaga Central and Ndia Constituencies Kshs.5 million each. (3) That, to improve street lighting in the counties that expressed critical need, the following allocations be made: In Nairobi County, street lights in Karen, Gitiba, Mutuini to receive Kshs5 million. Street lights in Embakasi Central, Embakasi North, Embakasi West and Mathare Constituencies - Kshs15 million. In Mombasa County, for the installation of street lights on roads in Changamwe - Kshs5 million. (4) That, funds be allocated for bridges and be distributed in the following manner: In Makueni County, Thwake Bridge - Kshs150 million for the completion of this bridge that will cut the distance of two constituencies to Wote headquarters by a distance of 120 kilometres. People have to travel a distance of 140 kilometres because there is no bridge. The completion of the bridge will cut the distance by 115 kilometres to 25 kilometres to access Wote, the county The electronic version of the Official Hansard Report is for information purposes only. Acertified version of this Report can be obtained from the Hansard Editor."
}