GET /api/v0.1/hansard/entries/802566/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 802566,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/802566/?format=api",
"text_counter": 376,
"type": "speech",
"speaker_name": "Hon. (Dr.) Pukose",
"speaker_title": "",
"speaker": {
"id": 1458,
"legal_name": "Robert Pukose",
"slug": "robert-pukose"
},
"content": "99R.If, after a permit to construct a pipeline, a refinery, a bulk storage facility or a Validity of retail dispensing site has been granted, the execution of the works has not commenced permits. at the expiry of twelve months from the date on which the permit was granted, or at the expiration of any extended period which the licensing authority may allow, the permit shall cease to have effect. Destruction of 99S.(1) Where a person has constructed a pipeline, refinery, bulk storage facility, illegal construction. retail dispensing site or a centralized gas reticulation system without a permit, the licensing authority may-"
}