GET /api/v0.1/hansard/entries/82286/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 82286,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/82286/?format=api",
    "text_counter": 109,
    "type": "speech",
    "speaker_name": "Mrs. Ngilu",
    "speaker_title": "The Minister for Water and Irrigation",
    "speaker": {
        "id": 111,
        "legal_name": "Charity Kaluki Ngilu",
        "slug": "charity-ngilu"
    },
    "content": " Thank you, Mr. Temporary Deputy Speaker, Sir. I beg to reply. (a) I have provided details – and he has the details – of successfully drilled water boreholes and dams rehabilitated by the Ministry in Migori constituency and he can see that in his paper; and, (b) Giribe and Mubachi dams have been constructed and are currently operational while the design for Godkweru Dam has been completed and the dam will be constructed in the 2010/2011 Financial Year. Mosara Secondary School borehole has not been drilled due to lack of good ground water prospects. My Ministry is identifying a better site for drilling of a replacement borehole. Drilling and equipping for Godjajuok borehole has commenced and will be completed during this financial year."
}