GET /api/v0.1/hansard/entries/84833/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 84833,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/84833/?format=api",
"text_counter": 220,
"type": "speech",
"speaker_name": "Mr. MâMithiaru",
"speaker_title": "",
"speaker": {
"id": 72,
"legal_name": "Ntoitha M'mithiaru",
"slug": "ntoitha-mmithiaru"
},
"content": "Mr. Speaker, Sir, the Minister has given an answer which does not reflect the situation on the ground. Even some of the project names he has given do not belong to the two constituencies. Igembe North and Tigania constituencies are ASAL areas due to the nature of their climate. There is scarcity of water and, therefore, issues of boreholes and water pans are very crucial. What the Minister has read out as completed projects have been abandoned. These are projects which started in the year 2003. The essence of having regional development authorities is to fast-track development in those areas. The boreholes have not been drilled. The trees have not been planted. So, what I am asking the Minister to clarify is whether it is the funds which are not available, or whether it is the firms which have been given the jobs to do that are incompetent. When is the Ministry going to resume the drilling of the boreholes and the construction of the water pans?"
}