GET /api/v0.1/hansard/entries/90507/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 90507,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/90507/?format=api",
    "text_counter": 141,
    "type": "speech",
    "speaker_name": "Eng. M.M. Mahamud",
    "speaker_title": "The Assistant Minister for Energy",
    "speaker": {
        "id": 373,
        "legal_name": "Mohammed Maalim Mahamud",
        "slug": "mohammed-mahamud"
    },
    "content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) Kitui and Mwingi are supplied with electricity from Kindaruma Dam by a 33KV line. The main cause of power interruption is transformer vandalism. For example, in the last one month and a half, 14 transformers were vandalized in Kitui and its environs. On July 26th 2010, the 2.5 megavolt amps transformer at Kitui 3311KV primary sub-station failed due to vandalism, putting the whole of Kitui Town in darkness. The transformer was replaced with a similar one on July 27th 2010. (b) My Ministry is putting in place the following measures: We have upped the"
}