GET /api/v0.1/hansard/entries/916452/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 916452,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/916452/?format=api",
    "text_counter": 12,
    "type": "speech",
    "speaker_name": "The Deputy Speaker",
    "speaker_title": "",
    "speaker": null,
    "content": "Hon. Senators, the salient issues raised in the said Petition are as follows- (a) THAT, the construction of the Western Bypass Wangige Interchage by the Kenya National Highways Authority (KeNHA) through the MS China Roads and Beijing Corporation (CRBC) is affecting Wangige Primary School; an important institution in the area. (b) THAT, while the residents welcome the construction of the Western Bypass, Wangige Interchange, they find issue with the revised project designs submitted to them by KeNHA which will impact negatively on Wangige Primary School, Wangige High School, and the St. Peter’s ACK Church, Ndunyu. This differs significantly from the designs presented to them sometime in 2017 which indicated that none of the three institutions would be affected. (c) THAT, the residents of Wangige have addressed the matter with the KeNHA which has failed to give satisfactory response to their concerns including compensation for the loss of property. The electronic version of the Senate Hansard Report is for information purposesonly. A certified version of this Report can be obtained from the Hansard Editor, Senate."
}