GET /api/v0.1/hansard/entries/96211/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept

{
    "id": 96211,
    "url": "https://info.mzalendo.com/api/v0.1/hansard/entries/96211/?format=api",
    "text_counter": 27,
    "type": "speech",
    "speaker_name": "Mr. Kiunjuri",
    "speaker_title": "The Assistant Minister for Water and Irrigation",
    "speaker": {
        "id": 175,
        "legal_name": "Festus Mwangi Kiunjuri",
        "slug": "mwangi-kiunjuri"
    },
    "content": " Mr. Speaker, Sir, I beg to reply. (a) My Ministry, through the Tana Water Service Board, is currently undertaking rehabilitation of Timau Water Supply at a cost of Kshs36 million, which on completion, is going to supply clean and adequate water to Timau Township. (b) My Ministry has no plans of sinking a bore hole for Timau Sub-District Hospital as the ongoing rehabilitation of Timau Water Supply will improve the water supply to the hospital. The hospital will be supplied with water through a fifteen metre diameter pipeline from the mains. (c) Once rehabilitation of Timau water supply is completed, my Ministry, through Tana Water Service Board, is going to explore the possibility of putting up a sewerage system to serve Timau Township. A sewerage system is a capital investment which requires high budgetary allocation which needs to be properly costed before I can make any undertaking."
}