"speaker_name": "Mr. Obure",
"speaker_title": "The Minister for Public Works",
"speaker": {
"id": 118,
"legal_name": "Christopher Mogere Obure",
"slug": "christopher-obure"
},
"content": " Mr. Deputy Speaker, Sir, I beg to reply. (a) Nyanza Provincial Headquarters is being built in two phases. Phase One was completed in 2008 and connected with water, electricity and sewer. (b) An Occupancy certificate in compliance with health and safety regulations will be issued after completion of Phase Two, which is expected to be completed by 8th August, 2011. This is when the entire building will be officially commissioned as fully complete. (c) A power transformer was installed to ensure there is adequate electricity for those using the building. The building is equipped with two ground water tanks of 100,000 litres capacity and booster pumps to raise the water to high level floors of the building. This will ensure adequate water supply even in periods of water rationing."
}