GET /api/v0.1/hansard/entries/116413/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 116413,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/116413/?format=api",
"text_counter": 45,
"type": "speech",
"speaker_name": "Dr. Machage",
"speaker_title": "",
"speaker": {
"id": 179,
"legal_name": "Wilfred Gisuka Machage",
"slug": "wilfred-machage"
},
"content": "It is true that we have done some work on this road. Actually, the design has been carried out in two lots with respective estimated cost of construction as follows. Lot 1 which is C112 â Nyongoro-Witu-Lamu otherwise known as âMokoweâ, which is approximately 80-kilometres is rated to cost about Kshs4.8 billion to be built whereas the Hindi-Milimani-Mangai and Kiunga which is D568, which is approximately 150- kilometres will cost about Kshs6.7 billion. A total of about Kshs11.5 billion is necessary for this road. I have set out to look for good friends to fund the construction of this road."
}