GET /api/v0.1/hansard/entries/122043/?format=api
HTTP 200 OK
Allow: GET, PUT, PATCH, DELETE, HEAD, OPTIONS
Content-Type: application/json
Vary: Accept
{
"id": 122043,
"url": "https://info.mzalendo.com/api/v0.1/hansard/entries/122043/?format=api",
"text_counter": 283,
"type": "speech",
"speaker_name": "Mr. Kiilu",
"speaker_title": "",
"speaker": {
"id": 45,
"legal_name": "Peter L. N. Kiilu",
"slug": "peter-kiilu"
},
"content": "asked the Minister for Energy:- (a) when the Kwasomba (Emali)/Masumba and Matiliku/Kilili Rural electricity projects, which were constructed in 2007, will be commissioned; (b) what the cost of each project was; and, (c) why Spring Hill Youth Polytechnic, Kwakivoko Market, Tutini Borehole and Kalima Market which are situated along Kwasomba- Masumba power line were not connected during the construction of the power line."
}