Amason Kingi

Full name

Amason Jeffah Kingi

Born

1974

Post

Parliament Buildings
Parliament Rd.
P.O Box 41842 – 00100
Nairobi, Kenya

Email

jeffahk@yahoo.com

Email

magarini@parliament.go.ke

Telephone

0733826203

Telephone

733826203

Amason Kingi

Hon. Amason Kingi was the first Governor of Kilifi County where he served for two terms. He becomes the third Speaker of the Senate since 2013.

All parliamentary appearances

Entries 11 to 20 of 554.

  • 21 Aug 2012 in National Assembly: Asante sana Bwana Naibu Spika wa Muda kwa kunipa fursa hii ili nichangie mjadala huu. Mwanzo kabisa, ningependa kusema kwamba ninaunga mkono Hoja hii na ningependa kusema kwamba wale Wakenya ambao wameodhoreshwa katika Kamisheni hii ya kuangalia Mambo ya Mashamba ni Wakenya na watu ambao wanaweza. Ukimuangalia Mwenyekiti wa Kamisheni hii, Dr. Swazuri, utakuta kwamba ni mtu ambaye ninamjua vizuri sana. Ni mtu mchapa kazi na pia kutokana na elimu yake, ni mtu ambaye ana ujuzi sana katika mambo ya mashamba kwa sababu shahada yake ni ya Land Economics. Kwa hivyo, ni mtu ambaye kusema kweli, ataweza kuiendesha Kamisheni hii ... view
  • 21 Aug 2012 in National Assembly: Tunajua wazi kwamba mambo ya ardhi ilichangia pakubwa sana katika kuleta mtafaruku baada ya kura za mwaka wa 2007. Kwa hivyo, Tume hii itakuwa na fursa nzuri kuhakikisha kwamba shida ya ardhi imezikwa katika kaburi la sahau. Kama wahenga wanavyonena: “Mwamba ngoma huvutia kwake.” Ni matumaini yangu kuwa kwa sababu mwenyekiti wa Tume hii ni kijana kutoka Pwani, atafanya lolote lile kuhakikisha shida za ardhi katika mkoa huo zimetatuliwa. Kijana huyu anajua uchungu wa ukosefu wa ardhi kwa sababu ni mzaliwa wa Pwani. view
  • 1 Aug 2012 in National Assembly: Mr. Speaker, Sir, I beg to reply. (a) My Ministry has undertaken the following projects in Molo Constituency since 2009:- 1. Construction of 200 fish ponds at a cost of Kshs5 million during the 2009/2010 Financial Year. We have also constructed 100 fish ponds at a cost of Kshs2,500,000 during the 2010/2011 Financial Year. Some other five ponds were constructed in five learning institutions in the constituency during the 2011/2012 Financial Year. 2. My Ministry has also constructed one shallow water retention reservoir in Naishi Location, Njoro at a cost of Kshs500,000 during the 2010/2011 Financial Year. However, during the ... view
  • 1 Aug 2012 in National Assembly: (b) My Ministry has implemented the programme as outlined above and all the projects components, except the dam, have been operationalized in Molo Constituency. view
  • 1 Aug 2012 in National Assembly: Mr. Speaker, Sir, the only project that had problems in Molo Constituency as I have already indicated is the shallow water dam. I am not aware of any fish pond that is not in working condition. If the Member has any evidence to that effect, then as a Ministry, we are very much willing to follow it up very closely. We have recently posted a District Fisheries Officer to that district and we have not received any information to the contrary that indeed, some of these fish ponds are not operational. view
  • 1 Aug 2012 in National Assembly: Mr. Speaker, Sir, indeed, as a Ministry we are moving towards that particular direction. We have already commissioned studies to this effect. In fact, as far as the ocean is concerned, we want to do farming within the ocean through marine culture. This approach is still very much at the study level and we should move to actualization once we receive the results of these studies. view
  • 1 Aug 2012 in National Assembly: Mr. Speaker, Sir, we do not have a pond at Naishi. What we have is a shallow water reservoir at Naishi. What happened in 2011 during the long rains is that it was washed away together with the fingerings that we had stocked in that particular shallow water dam. However, as a Ministry, we are very much willing to accompany the Member to his constituency to make sure that whatever issues he has raised with the Ministry are well addressed on the ground. view
  • 1 Aug 2012 in National Assembly: Mr. Speaker, Sir, on the specific date when as a Ministry we will go to Molo, that is something we can agree with the Member for Molo, so that we can find a convenient date which is agreeable to both parties. I may give a date on the Floor of the House which may be convenient to me, but not convenient to the Member. Therefore, I undertake to consult with the Member and agree on a date when as a Ministry, we will go to Molo Constituency. view
  • 7 Dec 2011 in National Assembly: Mr. Speaker, Sir, I had a word with Mrs. Odhiambo-Mabona and since she did not have a copy of the written answer, we agreed that I should answer this Question tomorrow. view
  • 22 Nov 2011 in National Assembly: Mr. Speaker, Sir, let it be on Tuesday next week. view

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus