All parliamentary appearances
Entries 81 to 90 of 793.
-
2 Aug 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, as you will realize, the parcel of land falls under the Ministry of Roads. Before we issue the TOL, we would have to get authority from the Ministry of Roads to utilize that land. As I said, the first steps are in place and the procedures are being followed. Therefore, we are taking this issue seriously.
view
-
2 Aug 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I want to assure the Member, as I did on phone this morning, that I have already consulted the Town Clerk, and he has said that he is very willing to endure that there is a way of ensuring that the residents plant flowers. The parcel of land is not his and he still needs that okay from the Ministry of Roads. I undertook to the Member that we will ensure that this is possible.
view
-
2 Aug 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I beg to reply. (a) My Ministry is constructing 211 markets under the Economic Stimulus Programme (ESP). The completion status is as follow:- (i) 100 markets are practically complete and ready for use, representing 47 per cent of all the projects. (ii) 49 market projects are at the final stages of completion, representing 25.3 per cent of all the projects. (iii) 54 market projects have ongoing works, representing 26 per cent of all the projects. (iv) 3 markets are at the initial stages of development, representing 1.4 per cent of all projects. (v) 5 market ...
view
-
2 Aug 2012 in National Assembly:
Thank you, Mr. Temporary Deputy Speaker, Sir. I will certainly oblige to that. The tender has now been approved and awarded to M/s Kenyash Inter-Business Enterprises Limited for Kshs12,116,420.40. A letter of award was issued on 29th February 2012 requiring the contractor to provide a performance bond of 5 per cent in the form of a bank guarantee. The notification of award was sent to M/s Kenyash Inter- Business Enterprises Limited through P.O Box address 23606-00625, Nairobi, which the contractor confirmed was wrong and hence the delay in receiving the notification award. The correct address of the contractor is P.O. ...
view
-
2 Aug 2012 in National Assembly:
Mr. Temporary Deputy Speaker, Sir, I have a letter I had written to the Speaker. I have not been given permission as yet, but I had requested a ten-day leave because I will be out of the country. I would request two weeks if that would be okay.
view
-
2 Aug 2012 in National Assembly:
Mr. Temporary Speaker, Sir, you are aware that there is only one Assistant Minister and an Acting Minister.
view
-
1 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, first let me apologize for not being in time but I was listening to the proceedings. I have run very fast and just like the Assistant Minister for Roads, I am not satisfied with the answer. If you will indulge me for one week, I will give a very substantive answer.
view
-
1 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, I want to assure you that we do not have that problem in the Ministry of Local Government. You are aware that the substantive Minister is unwell. I had six Questions this week and I looked at all of them on Monday and when I saw the answer to this particular Question, I realized that it was not going to be satisfactory. I then contacted the Town Clerk who assured me that he would address the Question himself and give me the answer within 48 hours. I am waiting for that answer so that I can ...
view
-
1 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, it was Monday afternoon so the 48 hours have not lapsed.
view
-
1 Aug 2012 in National Assembly:
Mr. Deputy Speaker, Sir, today being Wednesday, I would be happy to answer the Question on Tuesday, next week. The answer will be with the hon. Member on Friday morning.
view