Aldai

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (186)

There are 186 CDF projects in Aldai. These are the most expensive:

  • Oroba River Bridgechepswert Magoi (2005): Ksh 4,514,000 spent on Construction Of A Bridge. (more)
  • Kapsengere Dispensary (2003): Ksh 3,400,000 spent on Construction Of Health Facility. (more)
  • Kaptumo Health Centre (2003): Ksh 2,800,000 spent on Construction Of Female Ward To Completion. (more)
  • Kemeloi Health Centre (2003): Ksh 2,700,000 spent on Construction Of Female/Male Ward. (more)
  • Koyo Health Centre (2003): Ksh 2,600,000 spent on Expansion - Maternity Wing. (more)
  • Kaptumek Health Centre (2003): Ksh 2,600,000 spent on Expansion - Maternity Wing. (more)
  • Cheptingwich Heath Centre (2004): Ksh 2,300,000 spent on Completion Of Health Centre (Plastering And Painting). (more)
  • Frair Girls Secondary School (2004): Ksh 2,200,000 spent on Twin Laboratory/Library. (more)
  • Kapkolei Girls Secondary School (2004): Ksh 2,200,000 spent on Dining Hall. (more)
  • Ahebisaas Secondary School (2004): Ksh 2,200,000 spent on Dining Hall/ Dormitory. (more)

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus