CDF Projects (174)

There are 174 CDF projects in Baringo North. These are the most expensive:

  • Aiyebo Borehole water project (2005): Ksh 4,450,000 spent on Drilling of Borehole and equipping. (more)
  • Kapteberewo Borehole W/P (2004): Ksh 3,300,000 spent on Drilling of Borehole and Equipping. (more)
  • Embara water project (2005): Ksh 3,200,000 spent on Construction of Gravity Water project. (more)
  • Moi Kabartonjo Borehole project (2004): Ksh 2,850,000 spent on Main piping, Drilling of Borehole and equipping. (more)
  • Ossen Borehole water project (2004): Ksh 2,800,000 spent on Drilling of Borehole and equipping. (more)
  • Sigerger Water Project (2006): Ksh 2,650,000 spent on Construction and piping of Gravity Water. (more)
  • Arap Moi/Rimo secondary School (2004): Ksh 2,650,000 spent on Procurement of Generator set and installation and construction of lab. (more)
  • Kipcherere secondary School (2005): Ksh 2,500,000 spent on Construction of Classrooms, Administration block, dormitory procurement of desks and beds.. (more)
  • Aiyebo Secondary School (2006): Ksh 2,300,000 spent on Completion of Dining Hall, furniture, 1 class. (more)
  • Keturwo Secondary School (2006): Ksh 2,200,000 spent on Construction of Classrooms and 2 dormitories. (more)