There are 101 CDF projects in Belgut.
These are the most expensive:
-
Kapcheluch Secondary School (2003):
Ksh 2,200,000
spent on Construction dining Hall/Kitchen.
(more)
-
Chepkutung Secondary School (2003):
Ksh 2,000,000
spent on Construction Of Classrooms, Administration Block And Temporary Kitchen.
(more)
-
Keben Secondary School (2003):
Ksh 1,750,000
spent on Construction Of Administration Block.
(more)
-
Cheribo Secondary School (2004):
Ksh 1,500,000
spent on Construction Of Administration Block.
(more)
-
Sosiot Girls Secondary School (2004):
Ksh 1,300,000
spent on Construction Of 2 Classrooms.
(more)
-
Kabianga Water Project (2005):
Ksh 1,250,000
spent on Supply Of Storage Tanks And Pipes.
(more)
-
Kendabei Water Project (2004):
Ksh 1,150,000
spent on Supply Of Storage Tanks.
(more)
-
Kiptere Secondary School (2005):
Ksh 1,100,000
spent on Construction Of BoyS Dormitory.
(more)
-
Cheptenye Secondary School (2005):
Ksh 1,000,000
spent on Construction Of BoyS Dormitory.
(more)
-
Koiwalelach Water Project (2003):
Ksh 770,000
spent on Spring Protection.
(more)