Eldama Ravine

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (236)

There are 236 CDF projects in Eldama Ravine. These are the most expensive:

  • Koisamo/ Sigoro/Kiptuno Road (2005): Ksh 6,000,000 spent on Spot Gravelling, Clearing And Drainage Along The Koisamo/Sigoro/Kiptuno Road. (more)
  • Kaplesir Water Project (2006): Ksh 5,400,000 spent on Environmental Impact Assessment, Water Analysis, Construction Of Intake And Purchase Of Pipes For water distribution. (more)
  • Mumberes Water Project (2009): Ksh 5,150,000 spent on Construction Of Intake, Tank And Purchase Of Pipes For Reticulation Of Water. (more)
  • Narosura-Emkwen Clean Water Project (2003): Ksh 5,000,000 spent on Construction Of Intake, Three Tanks And Piping Of Water To The Distribution Tanks Closer To The Constituents. (more)
  • Kiptuno Community Water Project (2004): Ksh 4,800,000 spent on Construction Of Intakem Tank And Piping Of Water Closer To The Residents. (more)
  • Assururiet Water Project (2004): Ksh 4,000,000 spent on Construction Of Intake And Purchase Of Pipes For Reticulation Of Water. (more)
  • Mumberes Girls Secondary School (2003): Ksh 3,850,000 spent on Construction Of Classrooms And Dormitory. (more)
  • Torongo Secondary School (2005): Ksh 2,950,000 spent on Construction Of Classroom, Dining Hall And Kitchen. (more)
  • Perkerra Water Project (2007): Ksh 2,350,000 spent on Purchase Of Pipes And Construction Of Tank. (more)
  • Tulwomoi Primary School (2005): Ksh 2,320,000 spent on Construction Of Classroom And Supply Of Power To The School. (more)