Ganze

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (53)

There are 53 CDF projects in Ganze. These are the most expensive:

  • Mwangea Girls Secondary School (2004): Ksh 13,600,000 spent on Construction Of 4 Classroom&Admin Block;Provide Desks Construction Of Staff Room;Equipments Construction Of Science Laboratory. (more)
  • Bamba Maryango Water Pipeline (2006): Ksh 11,550,000 spent on Trenching&Fitting Of 114 Km Pipeline And Water Points. (more)
  • Ganze Secondary School (2004): Ksh 7,600,000 spent on Construction Of A Multipurpose Hall With Energey Saving Jiko Changing Rooms, Toilets, Store, And Office Electrical Installation. (more)
  • Bamba Bandari Pipeline (2006): Ksh 7,000,000 spent on Trenching&Fitting Of ;2 Km Pipeline Construction Of Water Tank&Water Points. (more)
  • Jaribuni Secondary School dining (2004): Ksh 6,500,000 spent on Construction Of A Multipurpose Hall With Energey Saving Jiko Changing Rooms, Toilets, Store, And Office Electrical Installation. (more)
  • Vitengeni Baptist Secondary School Science Block (2005): Ksh 6,050,000 spent on Construction Of Twin Laboratory. (more)
  • Nzovuni Primary School -Classrooms &Office (2006): Ksh 5,966,692 spent on Construction Of 6 Classrooms&Admin. (more)
  • Silala/Kachororoni (2006): Ksh 5,700,000 spent on Construction Ofdispensary. (more)
  • Dungicha Dispensary (2005): Ksh 5,700,000 spent on Construction Of 1Dispensary. (more)
  • Jila Dispensary (2005): Ksh 5,700,000 spent on Construction Of 1 Dispensary. (more)