There are 235 CDF projects in Juja.
These are the most expensive:
-
Bursary (2005):
Ksh 18,776,342
spent on bursary.
(more)
-
Emergency (2004):
Ksh 10,397,834
spent on n/a.
(more)
-
Admin/Mon&Eval (2003):
Ksh 8,373,685
spent on n/a.
(more)
-
Githurai Location Roads (2005):
Ksh 6,150,000
spent on Light Grading.
(more)
-
Juja Location Road (2004):
Ksh 6,031,141
spent on Light Grading &Gravelling.
(more)
-
Thika/Gatuanyaga Road (2006):
Ksh 5,917,000
spent on Light Grading&Culverts.
(more)
-
Ruiru Location Roads (2006):
Ksh 5,900,000
spent on Culverts,Grading&Murraming .
(more)
-
Gitothua Pri Boreholeprison (2004):
Ksh 4,600,000
spent on Tank Tower, Pipes&Water Kiosk .
(more)
-
Monitoring/Evaluation (2005):
Ksh 4,214,038
spent on n/a.
(more)
-
Muigai Inn Borehole (2004):
Ksh 3,600,000
spent on Water Pipes.
(more)