Kajiado Central

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (353)

There are 353 CDF projects in Kajiado Central. These are the most expensive:

  • Loodokilani secondary School (2005): Ksh 4,000,000 spent on To equip laboratory and purchased furniture.. (more)
  • Enkorinka Boys Secondary School (2004): Ksh 2,800,000 spent on Construction of Administration block. (more)
  • Enkorika secondary School (2009): Ksh 2,000,000 spent on constructing of a dining hall and dormitory. (more)
  • Arroi Bore-hole (Enkusero Water Project) (2003): Ksh 1,500,000 spent on Piping of Water to the Site. (more)
  • Lorngosua Bore-hole (2003): Ksh 1,500,000 spent on Drilling a new bore-hole. (more)
  • Oleleshwa Milk Project (2006): Ksh 1,400,000 spent on dairy construction. (more)
  • Iloshon Water Project (2004): Ksh 1,200,000 spent on Buying of Pipes. (more)
  • Inkipirash Milk Project (2006): Ksh 1,150,000 spent on dairy construction. (more)
  • A.I.C Girls secondary School (2006): Ksh 1,000,000 spent on Construction of 2 Classrooms. (more)
  • Enkorika boys Secondary School (2006): Ksh 1,000,000 spent on Construction of students ablution block, kitchen, bath, dorm and dining hall + Purchase of office furniture. (more)