Karachuonyo

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (285)

There are 285 CDF projects in Karachuonyo. These are the most expensive:

  • Kanyaluo Water Project (2004): Ksh 3,700,000 spent on Piping. (more)
  • Kendu Bay Sub District Hosp (2003): Ksh 3,400,000 spent on Construction of 2 Wards. (more)
  • Achuna Dam (2004): Ksh 2,700,000 spent on Drilling. (more)
  • St Alfred Alara Secondary School (2005): Ksh 2,200,000 spent on Construction of Offices. (more)
  • Adiedo Health Centre (2003): Ksh 2,136,246 spent on Construction of Ward. (more)
  • Constituency Office (2009): Ksh 2,000,000 spent on Construction. (more)
  • Atandi Adc Farm (2006): Ksh 2,000,000 spent on Irrigation. (more)
  • Wagwe Health Centre (2003): Ksh 1,980,000 spent on Construction of Health Centre. (more)
  • Ongalo Secondary School (2004): Ksh 1,850,000 spent on Construction of Laboratory. (more)
  • Kobila Secondary School (2003): Ksh 1,700,000 spent on Construction of Laboratory. (more)

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus