Kathiani

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (147)

There are 147 CDF projects in Kathiani. These are the most expensive:

  • Syokimau Road (2004): Ksh 13,308,000 spent on Heavy Grading. (more)
  • Komarock Mitaboni Ngoleni Road (2006): Ksh 6,820,093 spent on Heavy Grading,Gravelling And Culverts. (more)
  • Kyumbi Water Project (2003): Ksh 4,070,057 spent on Construction Of Water Tank, Drilling Of Borehole. (more)
  • Muooni Dam (2007): Ksh 3,500,000 spent on Desilting Of Existing Dams. (more)
  • Mitaboni Borehole (2007): Ksh 3,000,000 spent on Drilling & Casing/Equiping. (more)
  • Muonyweni Borehole (2006): Ksh 3,000,000 spent on Drilling & Casing/Equiping. (more)
  • Ngelani Borehole (2007): Ksh 2,892,540 spent on Drilling & Casing/Equiping. (more)
  • Mlolongo/Wood Borehole Drilling (2006): Ksh 2,800,000 spent on Sinking&Equipping Of Bore Hole. (more)
  • Muthwani Borehole (2007): Ksh 2,700,000 spent on Drilling & Casing/Equiping. (more)
  • Ithaeni Maternity Wing (2004): Ksh 2,100,000 spent on Construction Of 3Storey Building&Equipping. (more)

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus