Kiharu

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (237)

There are 237 CDF projects in Kiharu. These are the most expensive:

  • Gakaki Water Project (2003): Ksh 2,893,333 spent on Pipeworks. (more)
  • Mukangu Dispensary (2004): Ksh 2,848,596 spent on Construction. (more)
  • Gacaru Water Project (2007): Ksh 2,500,000 spent on Piping. (more)
  • Kiamugo Borehole (2007): Ksh 2,290,041 spent on Drilling And Equipping. (more)
  • Mutitu Irrigation Project (2007): Ksh 2,000,000 spent on Phase 1 Irrigation. (more)
  • Kaganda Secondary School (2008): Ksh 2,000,000 spent on Construction Of 2 Classrooms. (more)
  • Gitui Police Post (2004): Ksh 1,955,096 spent on Construction. (more)
  • Gikandu Water Project (2004): Ksh 1,922,596 spent on Gravity Water Piping. (more)
  • Muchungucha Water Project (2007): Ksh 1,900,000 spent on Piping. (more)
  • Theri Secondary School (2004): Ksh 1,880,000 spent on Laboratory Construction. (more)

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus