CDF Projects (159)

There are 159 CDF projects in Marakwet West. These are the most expensive:

  • Mtc Kapsowar (2006): Ksh 4,500,000 spent on Solar Installation. (more)
  • Chebara Youth Polytechnic (2004): Ksh 3,531,178 spent on Construction Of A Classroom. (more)
  • Lelan Secondary School (2004): Ksh 3,300,000 spent on Construction Of A Dormitory. (more)
  • Arror Secondary School (2004): Ksh 3,000,000 spent on Construction Of A Renovation. (more)
  • Kamoi Secondary School (2005): Ksh 2,600,000 spent on Adm.Block And One Classroom. (more)
  • Koisungur Secondary School (2003): Ksh 2,480,000 spent on Plastering Flooring& Painting Renovation & 1 Classroom. (more)
  • St Teressa Koibarak Girls Secondary School (2003): Ksh 2,224,503 spent on Plastering, Flooring And Painting. (more)
  • Kapcherop Mixed Secondary School (2005): Ksh 2,200,000 spent on Construction Of 1 Classroom And Lab. (more)
  • Hossen Mixed Day Secondary School (2005): Ksh 2,180,000 spent on Construction Of A Dormitory & Kitchen. (more)
  • Chebai Secondary School (2004): Ksh 2,000,000 spent on Renovation Of Adm. Block And 2 Classrooms, Plastering Of 2 Classrooms. (more)