There are 81 CDF projects in Moyale.
These are the most expensive:
-
Sololo Water Project (2007):
Ksh 11,300,000
spent on Supply Of Water From Walda To Sololo.
(more)
-
Obbu Girls Secondary School (2003):
Ksh 8,400,000
spent on Construction Of Administra-Tion Block And Two Dormito-Ries And Three Classroomsand Laboratory..
(more)
-
Anona Borehole (2007):
Ksh 4,000,000
spent on Sinking Bore Hole.
(more)
-
Ele Borr Borehole (2007):
Ksh 4,000,000
spent on Drilling Bore Hole Classroom.
(more)
-
Manyatta Primary School (2003):
Ksh 3,300,000
spent on Eight Classrooms And Adm Block Built.
(more)
-
Godoma Didiqo Primary School (2003):
Ksh 2,900,000
spent on Construction Of Two Classroom And Two Latrine.
(more)
-
Baliti Secondary Walda (2006):
Ksh 2,800,000
spent on Construction Of Admin. Block And Classroom And Dormitory.
(more)
-
Holale Primary School (2004):
Ksh 2,700,000
spent on Three Classroom Adm Block Kitchen And Toilet Built.
(more)
-
Uran Godha Primary School (2003):
Ksh 2,500,000
spent on Construction Of Classroom.
(more)
-
Sololo Dispensary (2008):
Ksh 2,500,000
spent on Construction Of Health Centre.
(more)