There are 33 CDF projects in Mvita.
These are the most expensive:
-
Mvita Secondary School (2005):
Ksh 22,933,923
spent on Construction 8 Classes,2Labs,Lib&Admn Block.
(more)
-
Sheikh Abdalla secondary School (2004):
Ksh 15,586,923
spent on Construction 8 Classes,2Labs,Lib&Admn Block.
(more)
-
Mvita drainage (2005):
Ksh 13,000,000
spent on Layin Pavin Blocks(Cabro) On ;3Km Rd.
(more)
-
Mvita Clinic (2004):
Ksh 8,000,000
spent on Drilling 1Borehole&Construction Perimeter Wall.
(more)
-
Majengo burnely paving (2007):
Ksh 8,000,000
spent on Layin Pavin Blocks(Cabro) On 1Km Rd.
(more)
-
Majengo minazini paving (2007):
Ksh 7,000,000
spent on Layin Pavin Blocks(Cabro) On 1Km Rd.
(more)
-
Majengo ropa paving (2007):
Ksh 3,720,000
spent on Layin Pavin Blocks(Cabro) On 1Km Rd.
(more)
-
Schools rehabilitation (2005):
Ksh 2,636,326
spent on Painting 1 Schl&Construction Toilets In 2 Schl.
(more)
-
Tononoka nursery School (2007):
Ksh 2,500,000
spent on Roofin,Windows,Painting&Construction Of Toilets.
(more)
-
Ziwani ground rehabilitation (2008):
Ksh 2,000,000
spent on Rehabilitate Ziwani Footbal Pitch.
(more)