There are 94 CDF projects in Narok South.
These are the most expensive:
-
Loita Secondary School (2003):
Ksh 4,700,000
spent on Construction of two (2) Classrooms, Dining Hall Kitchen and Ablution block.
(more)
-
Ololulunga secondary (2005):
Ksh 4,614,417
spent on Construction of 3 classrooms and Two Dormitories.
(more)
-
Siana Borehole (2005):
Ksh 4,300,000
spent on Drill a borehole, equip it and do piping.
(more)
-
Ololulunga District Hospital (2003):
Ksh 4,218,241
spent on Construction of health center, Maternity Ward, pit latrines and purchase of storage tank and beds, admin block.
(more)
-
Sogoo water project (2004):
Ksh 3,700,000
spent on Sinking of borehole, equipping it and piping.
(more)
-
Aitong Pr. School (2003):
Ksh 3,000,000
spent on Construction of two (2) Classrooms,and dormitory, FY 2008/09 Construction of 2 units staff house.
(more)
-
Entasekera -mausa Road (2006):
Ksh 3,000,000
spent on Grading of Road.
(more)
-
Ngiito Secondary School (2005):
Ksh 2,900,000
spent on Construction of Dormitory and one laboratory in FY 2008/09 & 2009/10.
(more)
-
Naroosura secondary School. (2003):
Ksh 2,700,000
spent on Construction of four (4) Classrooms, Dining Hall Kitchen and Ablution block.
(more)
-
Naroosura Health Centre (2007):
Ksh 2,550,000
spent on Build Doctors’ house and a ward.shs 5m is for construction of a ward 2008/09.
(more)