CDF Projects (94)

There are 94 CDF projects in Narok South. These are the most expensive:

  • Loita Secondary School (2003): Ksh 4,700,000 spent on Construction of two (2) Classrooms, Dining Hall Kitchen and Ablution block. (more)
  • Ololulunga secondary (2005): Ksh 4,614,417 spent on Construction of 3 classrooms and Two Dormitories. (more)
  • Siana Borehole (2005): Ksh 4,300,000 spent on Drill a borehole, equip it and do piping. (more)
  • Ololulunga District Hospital (2003): Ksh 4,218,241 spent on Construction of health center, Maternity Ward, pit latrines and purchase of storage tank and beds, admin block. (more)
  • Sogoo water project (2004): Ksh 3,700,000 spent on Sinking of borehole, equipping it and piping. (more)
  • Aitong Pr. School (2003): Ksh 3,000,000 spent on Construction of two (2) Classrooms,and dormitory, FY 2008/09 Construction of 2 units staff house. (more)
  • Entasekera -mausa Road (2006): Ksh 3,000,000 spent on Grading of Road. (more)
  • Ngiito Secondary School (2005): Ksh 2,900,000 spent on Construction of Dormitory and one laboratory in FY 2008/09 & 2009/10. (more)
  • Naroosura secondary School. (2003): Ksh 2,700,000 spent on Construction of four (4) Classrooms, Dining Hall Kitchen and Ablution block. (more)
  • Naroosura Health Centre (2007): Ksh 2,550,000 spent on Build Doctors‚Äô house and a ward.shs 5m is for construction of a ward 2008/09. (more)