Othaya

Constituency (Parliament)

Past Constituency: from 28th December 2007 to 14th January 2013

CDF Projects (165)

There are 165 CDF projects in Othaya. These are the most expensive:

  • Othaya Social Hall (2004): Ksh 16,347,286 spent on Flooring. (more)
  • Witima Health Centre (2005): Ksh 5,500,000 spent on Flooring&Walling. (more)
  • Witima Police Station (2003): Ksh 4,100,000 spent on Flooring&Walling. (more)
  • Munyange Police Station (2003): Ksh 3,550,000 spent on Flooring&Walling. (more)
  • Munyange Dispensary (2005): Ksh 3,325,856 spent on Walling,Painting. (more)
  • Othaya Boys (2004): Ksh 3,270,000 spent on Flooring. (more)
  • Mahiga Commcentre (2006): Ksh 3,000,000 spent on Foundation. (more)
  • Iria - Ini Commcentre (2006): Ksh 2,900,000 spent on Walling. (more)
  • Mch/Refrigerators (2007): Ksh 2,417,992 spent on n/a. (more)
  • Thunguri Dispensary (2005): Ksh 2,351,664 spent on Plastering&Walling. (more)

Comments

(For newest comments first please choose 'Newest' from the 'Discussion' tab below.)
comments powered by Disqus