There are 367 CDF projects in Sirisia.
These are the most expensive:
-
Sirisia Water Tank (2005):
Ksh 4,200,000
spent on Water Tank.
(more)
-
Kisiwa Politechnic (2008):
Ksh 4,038,747
spent on Wiring Of Adm Block & Tuition Block.
(more)
-
Lurende/Khachonge Bridge (2006):
Ksh 3,682,000
spent on Construction Of Bridge.
(more)
-
Marobo/Luuya (2004):
Ksh 3,000,000
spent on Construction Of Bridge.
(more)
-
Old Kibichori Water (2008):
Ksh 3,000,000
spent on Construction Of Tank.
(more)
-
Kisiwa Y/Polytechnic (2003):
Ksh 2,681,800
spent on Equipments/Renovation.
(more)
-
Kibichori- Sichei Road Gravelling (2008):
Ksh 2,500,000
spent on Road Grading, Gravelling, Muraming And Putting Culverts.
(more)
-
Kikai-Binyenya Bridge (2006):
Ksh 2,418,000
spent on Construction Of Bridge.
(more)
-
Busakala Water Tank (2005):
Ksh 2,270,000
spent on Tank Construction.
(more)
-
Nakayonjo Milembe Bridge (2004):
Ksh 2,200,000
spent on Construction Of Bridge.
(more)