There are 436 CDF projects in Sotik.
These are the most expensive:
-
Kampira primary School (2004):
Ksh 4,050,000
spent on Classroom construction.
(more)
-
Kamureito Water project (2004):
Ksh 3,515,101
spent on Piping system.
(more)
-
Kimolwet secondary School (2004):
Ksh 3,460,000
spent on dining hall construction.
(more)
-
Chebilat secondary School (2006):
Ksh 2,800,000
spent on Classroom construction.
(more)
-
Tamongo primary School (2006):
Ksh 2,180,000
spent on Classroom construction.
(more)
-
Ndanai secondary School (2004):
Ksh 1,861,938
spent on Lab construction.
(more)
-
Togomin primary School (2004):
Ksh 1,750,000
spent on 4 Classrooms construction.
(more)
-
Kipsimbol primary School (2005):
Ksh 1,280,000
spent on Classroom construction.
(more)
-
Kipsingei secondary School (2004):
Ksh 1,256,938
spent on Classroom building.
(more)
-
Tarakwa Health Center (2003):
Ksh 1,179,775
spent on Delivery room construction.
(more)